DJT-6 series of asphalt off-barrel euipment

Original
price: Negotiable
minimum:
Total supply:
Delivery term: The date of payment from buyers deliver within days
seat: Beijing
Validity to: Long-term effective
Last update: 2017-11-29 09:06
Browse the number: 53
inquiry
Company Profile
 
 
Product details
There are two kinds asphalt melting equipment which are 5t/h and 8t/h type based on productivity.
Main Data:
1. Productivity: 8t/h in circumstance temp ≥250C
2. Storage Ability: 25T
3. Temperature: 1000C
4. Outer Size: 10500×3200×2650mm
5. Power: 11KW
6. Weight: 20T
7. Hydraulic System Pressure (adjustable): 2Mpa- 12Mpa
8. Cylinder Stroke: 1300 mm
9. Max Push Power: 7.5t
10. Hoister: 0.5T*2
11. Bitumen Pump: 3 inch
The device of container type is easy for transport and disassembly. It uses the conducting oil through encryption of seamless pipes (Ф76, Ф51) to enable short heating time; it can use the propellers to push the barrels into the container continuously and thus ensure the productivity. The 5cm mineral wool is put outside for insulation and the surface uses color steel plate for packing.
Total0bar [View All]  Related Comments
 
more»Other products

[ Products search ] [ favorites ] [ Tell friends ] [ Print ] [ Close ]